VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGE702-749-4369
Montridge Insurance Services, Inc.ENERGY INDUSTRY
INSURANCE & RISK RESOURCES
Energy resource center

Privacy & media preferences

Understand optional preferences, video connections and external scheduling.

Your choices do not block the website.

You can browse every resource without accepting optional analytics. Google Analytics 4 is used only after you accept optional analytics. It measures page views and consultation and telephone link clicks to help us understand website use. Google may receive technical information about your device, browser and visit and may store first-party analytics cookies. Advertising storage, advertising user data, advertising personalization and Google signals are disabled. Accept or Decline stores your choice in browser local storage where available; your existing saved choice is respected. If browser storage is unavailable, preferences may not persist between pages.

Video connections

Videos use click-to-load YouTube privacy-enhanced embeds. No YouTube player or remote thumbnail is requested before you press Load video. Loading a player connects your browser to YouTube, which may receive technical and usage information under its own terms. You can instead follow the labeled YouTube link. Decline / withdraw removes loaded players on this page and signals the preference to other open tabs on the same browser origin. It cannot erase information already received by YouTube. A later explicit Load video click requests that individual player again; it does not activate analytics or change your saved preference.

Scheduling and telephone links

Scheduling opens Google Calendar. Telephone links invoke your device’s calling handler. Third-party destinations operate under their own notices. No consultation is booked and no telephone call is made merely by viewing this website.

Hosting and analytics preferences

The hosting provider may process technical information needed to deliver the website. Declining prevents the optional Google tag from loading. Withdrawing disables further analytics collection, removes this site’s accessible analytics cookies and reloads the page to unload the running tag. Withdrawal does not erase information already sent to Google. Changes are shared with other open tabs on this site when browser storage is available. Learn more in Google’s Privacy Policy. This website does not claim that provider-level operational logging is disabled.

Change your preference

For questions about information shared directly with Montridge, call 702-749-4369. Do not submit confidential claims, medical, financial or personnel information through an unapproved channel.

YOUR OPERATIONS. YOUR OBLIGATIONS.

Put your insurance in the context of your energy business.

Schedule consultation ↗

Or call 702-749-4369