FOR Land drilling contractors and drilling service managers
Describe the rig and its contractual role
A drilling contractor submission should explain the rig type, drilling methods, operating territory, depth profile, and services included in the contract. Distinguish a daywork arrangement from other contract structures without assuming any label settles responsibility. The actual agreement may allocate equipment, personnel, well damage, and consequential losses differently.
List which entity employs the crew, supplies the rig, owns downhole tools, and hires specialist service companies. Include ancillary work such as rig moves, site preparation, pressure testing, and maintenance. These activities may introduce exposures that are easy to overlook when a submission is summarized simply as drilling.
Separate rig damage from well-related losses
Physical damage to a rig is a different question from loss of well control, damage to the well itself, pollution, or the cost of retrieving tools. Ask where each exposure is intended to sit in the insurance program and compare that intention with the relevant definitions, exclusions, and endorsements.
Review scheduled values, transit arrangements, leased equipment, and debris removal. Explain any equipment operating underground, underwater, or at another contractor’s direction. A broad equipment description should not substitute for checking limitations on particular property or activities. Keep the owner’s and contractor’s responsibilities visible throughout the review.
Make operational controls part of the submission
Drilling involves work around moving machinery, pressure systems, vehicles, and other hazardous energy. OSHA’s oil and gas guidance is a useful starting point for identifying operational hazards, but the applicable requirements and controls must be established for the specific work. An insurance review does not replace the drilling contractor’s safety program.
Provide training records, maintenance procedures, inspection practices, and incident investigation examples where available. Explain how crews coordinate with the operator and specialist contractors. Underwriters can assess the operation more accurately when the submission shows who controls work, how changes are communicated, and how emergency response is organized.
Review the contract before accepting the job
Collect the drilling agreement, indemnity provisions, insurance specifications, and requested additional insured wording. Ask qualified counsel to evaluate enforceability and the allocation of liabilities. Ask the broker to assess whether the requested insurance terms are actually available and consistent across primary and excess layers.
Identify obligations that remain uninsured or uncertain, including assumed consequential losses and obligations involving another party’s property. A certificate should reflect insurance already arranged; it should not be used to promise contract compliance that has not been checked. Revisit the review when the rig, territory, drilling method, or contract form changes.
Pay particular attention to equipment supplied by the operator but used by the drilling crew. Record who maintains it, who may authorize repair, and who bears loss if it is damaged. This interface can be missed when the contractor schedules only assets on its own balance sheet and the operator assumes the contractor has accepted all responsibility under the drilling agreement.
Questions for your next review
- Which party assumes well-control and well-damage obligations?
- Are rig moves and downhole tools addressed?
- Do excess layers follow the intended drilling exposure?
Related Montridge webinars
Energy operations
Energy Contractor Insurance Checklist: Before Mobilizing a Project
Clicking Load video connects to YouTube. No player loads automatically.
Watch on YouTube ↗EPC, contracts and commercial coverage
What Insurance Do Oil & Gas Contractors Need? (Full Breakdown)
Clicking Load video connects to YouTube. No player loads automatically.
Watch on YouTube ↗Connect this topic to your program
Bring the operational details above into a coordinated review of your contracts, loss history and actual policy wording. Explore Montridge energy services insurance services for the related brokerage service.
Source references
Primary-source background informs the technical discussion. Insurance review questions are educational interpretation; a source link does not establish coverage or certify compliance.
Prepared November 1, 2026. Confirm current requirements and their application to your work before relying on them. Specific insurance outcomes require review of the complete policy and endorsements.

