FOR Maintenance, engineering, inspection and industrial service firms working at nuclear facilities
Describe the service precisely
A contractor installing fencing outside a controlled area has a different operating profile from a firm inspecting reactor equipment or handling radioactive material. Identify each task, location, customer and subcontracted activity. Include design, testing, software, quality assurance and transportation responsibilities. The fact that a customer operates a nuclear facility should trigger a detailed review, but it does not by itself establish which policy, indemnity or exclusion applies. Obtain the contract and work scope before relying on an insurance certificate or a general description of industrial maintenance.
Review the site arrangement in writing
Ask the customer to identify the nuclear liability or indemnity arrangement relevant to the work and provide the applicable documentation for specialist review. American Nuclear Insurers describes distinct insurance forms and nuclear-worker arrangements; their existence does not establish that a particular claim or contractor is protected. Identify who has notification duties and who controls defense. Confirm the treatment of offsite fabrication, transportation and subcontractors. A customer’s statement that the contractor is covered should be reconciled with actual terms and legal advice.
Examine the contractor’s own policies
Review nuclear exclusions, professional services definitions, pollution terms, contractual liability and damage to property being worked on. Conventional general liability, workers compensation, automobile and umbrella policies each require their own analysis. A professional services policy may not accept every engineering or inspection activity connected with a nuclear facility. Disclose the work fully to underwriters and request written treatment of relevant exposures. Do not presume that a policy with no nuclear reference in its title affirmatively insures nuclear-related liability.
An illustrative contract review might compare onsite inspection with fabrication of a replacement component at the contractor’s own shop. The location changes, but the component’s intended use and the contractor’s technical responsibility may remain significant. Ask underwriters and nuclear specialists about each activity expressly. Keep the response with the contract file and revisit it if the customer expands the scope. A certificate that describes only the project name is not enough to establish how those two work settings are treated.
Keep qualification and insurance evidence aligned
Maintain contracts, scope changes, customer qualification records, quality procedures, personnel training documentation and subcontractor controls. Identify work that could affect safety-critical equipment and how acceptance is documented. Review reporting procedures for a defect discovered after completion and the preservation of inspection records. For recurring service agreements, revisit insurance whenever the task expands or moves to another site. A disciplined review should separate conventional business protection, contractual obligations and specialist nuclear questions, including any work the existing program cannot support.
Questions for your next review
- Does the site arrangement expressly address this contractor and its actual tasks?
- Are offsite fabrication and transport included or separately allocated?
- What written underwriting position applies to nuclear-related professional services?
Connect this topic to your program
Bring the operational details above into a coordinated review of your contracts, loss history and actual policy wording. Explore Montridge power & utility contractor insurance services for the related brokerage service.
Source references
Primary-source background informs the technical discussion. Insurance review questions are educational interpretation; a source link does not establish coverage or certify compliance.
Prepared November 1, 2026. Confirm current requirements and their application to your work before relying on them. Specific insurance outcomes require review of the complete policy and endorsements.

