FOR Developers, utilities, power providers and infrastructure risk managers
Map the physical supply before comparing options
Document the complete route from generation and transmission to the campus service entrance, substation, distribution equipment and rack. Identify ownership, operating authority, maintenance access and alternate routes. Two labeled feeds may still depend on one substation, corridor or protection system.
Record firm and interruptible capacity, expected load growth, ramp requirements and the power needed for cooling and other support systems. These details help distinguish a connection sized for initial occupancy from one that can serve later AI workloads. A signed supply agreement does not itself prove that all physical upgrades are complete.
Compare supply models on the same basis
Utility service, behind-the-meter generation and hybrid arrangements distribute risk differently. Compare connection milestones, fuel availability, maintenance, backup duration, emergency operation, environmental permissions and rights to curtail load. Include who controls the system during an abnormal event.
Renewable procurement may address energy cost or environmental objectives without providing continuous onsite power. Batteries supply stored energy within their designed duration and operating constraints. Advanced nuclear proposals require separate licensing and project-status review. Do not describe any strategy as a universal substitute for resilience engineering.
Identify common dependencies
A campus with several generators can still depend on a shared gas supply, controls network, cooling loop or switchboard. Ask engineers to identify credible common-cause failures and the practical limits of redundancy. Consider regional events that may affect electricity, fuel delivery and repair access simultaneously.
For insurance review, distinguish damage to owned generation from external utility damage, non-damage curtailment and a supplier's inability to perform. Map each scenario to actual policy wording and contract remedies. A financial hedge or power contract may allocate cost without funding physical recovery.
Keep connection assumptions current
FERC's June 18, 2026 action directed six regional grid operators to justify or reform large-load connection rules. It does not establish an automatic delivery date for an individual campus. Confirm the applicable tariff, study agreements, state requirements and subsequent orders with the responsible utility and project counsel.
Maintain a power-risk register with evidence, owner, next milestone and contingency. Bring it into construction financing and insurance planning early enough to address gaps. The existing Energy utility and generation guides provide broader context; this page focuses on their combined effect on a data center.
Questions for your program review
- Which assets and routes are genuinely independent?
- What happens if capacity arrives after the building is ready?
- Which outage scenarios require physical damage for coverage?
Connect with existing Energy guidance
- Electric Utility Insurance & Risk Management
- Combined-Cycle Generation Insurance
- Business Interruption & Energy Revenue Resilience
Prepare for an Energy risk review, call 702-749-4369 or use the existing consultation link below.
Sources and verification notes
Technical and regulatory background is identified below. The loss scenarios and insurance review questions are educational analysis, not quoted policy terms, insurer approval or an indication of market access.
- FERC — Large load integration action ↗
2026-06-18. Show-cause orders to six regional grid operators. Consult the applicable subsequent orders and effective tariff; this is not a nationwide guaranteed connection timetable.
- FM — Data centers ↗
Undated; reviewed 2026-11-03. Engineering background on support systems, resilience and power dependencies. Product descriptions do not establish coverage for a reader.
Image identification
Electrical utility lines on steel poles with wind turbines in the distance · Illustrative photography 光术 山影 · Unsplash License. Illustrative infrastructure; no client relationship or endorsement is implied. Image source and credit ↗ · License ↗.
Reviewed November 3, 2026. Requirements and project status can change. Confirm current applicability and complete policy wording before relying on this material.